You can use different functions within Formpak to control how, why and when documents are updated and re-supplied.

Properties can be automatically recalculated on an ongoing basis using Automatic Processing. Documents can also be automatically revised based on changes to key properties. These key properties are ‘Versioning Properties’ and can be found in ‘View a Document Type’.

You can specify conditions under which a document should be re-supplied using Document Supply Conditions. These can be found in ‘View a Document Supply Condition’. If a document meets the criteria it will be flagged to be re-issued to the previous recipient. The standard situation is one where last sale dates are imported into Formpak and this is considered in deciding when it’s appropriate to send a revised document.
To set a supply condition for the above example go to ‘Modify a Document Supply Condition’ and follow the below process:

In the ‘Name’ box, enter the name of the document for which you want to set the supply condition.
In the ‘Automated supply for Sales’ box select ‘First Supply and Resupply’ or ‘First Supply only’ or ‘Resupply only’.
In the ‘Automate Supply for Samples’ box select any option
In the ‘Supplying Item Period’ box enter any number of months.
In the ‘Unsupplied Document Revision Period’ enter 12 months (this means a document supplied within the past 12 months will be triggered for resupply to a previous recipient if the document is revised).

Use the below example if you want to automatically resupply documents to previous recipients, but you don’t have any sales or samples information available in Formpak.

Go to ‘Modify a Document Supply Condition’
Select the document you need from the list, e.g. ‘IFRA Conformity Certificate’
Then make sure the settings are as follows:
In the ‘Automated Supply for Sales’ box select ‘Resupply only’
In the ‘Automated Supply for Samples’ box select ‘Resupply only’
In the ‘Supplying Item Period’ box enter 0 months
In the ‘Unsupplied Document Revision Period’ box enter 12 months
In the ‘Unrevised Document Resupply Period’ box enter 0 months
Finally, you need to ensure that your ‘Automatic Processing‘ is set to include ‘Revise Documents’ and ‘Determine Documents Required’.

 